The project to be implemented within

"At Baghpat, which lies along River Yamuna, it is proposed for Interception & Diversion of four drains falling into river Yamuna by laying of intercepting trunk sewer of length 2..52 km and treating sewage at 14 MLD STP.91 crore, it said.For sewerage zone-II, STP project is proposed at Rs 118.Gadkari will also initiate the development of sewage treatment projects (STPs) under the Namami Gange programme at these places.It said the minister will inaugurate in Moradabad the 146-km Aligarh-Moradabad stretch on NH-93 built at Rs 950 crore, and will lay the foundation stone of the 100-km long six-lane Hapur Bypass-Moradabad section of NH-24 to be constructed at a cost of Rs 3,441 crore."Union Minister for Road Transport & Highways, Shipping and Water Resources, River Development and Ganga Rejuvenation Nitin Gadkari will inaugurate and lay the foundation stones for 527 km length of NH (national highway) works amounting to Rs 11,595 crore in Moradabad, Meerut and Baghpat in Western Uttar Pradesh tomorrow," the Ministry of Road Transport and Highways said in a statement.It added that the river has been polluted significantly due to discharge of untreated/ or partially treated sewage disposed of through three drains. It is being taken up at a cost of Rs 77.

The project to be implemented within 18 months, includes 15 years O&M."At Baghpat, Gadkari will lay the foundation stone for the construction of 44-km-long two-lane with paved shoulders Meerut-Baghpat-UP/Haryana Border (Sonipat) section of NH-334B to be built at a cost of Rs 371 crore," the statement said.In addition, the minister will also lay the foundation stone of several projects under the Namami Gange programme, accompanied by Uttar Pradesh Chief Minister Yogi Adityanath.06 crore, the statement said.Besides, the foundation stone will be laid for the Rs 3,367-crore Garhmukteshwar-Meerut stretch, it said.In Meerut, the programme for pollution abatement of Kali river has been sanctioned with the total estimated cost of Rs 1,039.In Moradabad, famous for its brass handicrafts industry, the sewerage system and a 58 million litres China Stainless steel water pump Suppliers a day STP are under construction for zone-I of the town at an estimated cost of Rs 279.The statement said he will lay the foundation stone in Meerut for three projects -- the 88-km four-lane Meerut-Budhana-Shamli-UP/Haryana Border (Karnal) section of NH-709A to be built at a cost of Rs 708 crore, the 54-km-long four-lane Meerut-Najeebabad section of NH-119 at Rs 2,120 crore, and construction of additional facilities on 78-km-long Meerut-Muzaffarnagar section of NH at Rs 207 crore.36 crore," the statement said.New Delhi: Union Minister Nitin Gadkari on Wednesday will inaugurate and lay the foundation stone of Rs 11,595-crore highway projects in Uttar Pradesh, the government said Tuesday.69 crore, including 15 years of operation and maintenance cost.

The process of demarcating

Apart from the demand for ownership of land, they highlighted the need to keep the buffer zone of the coastline intact.Biz halved in last 20 yrs: fisherfolkThe Palghar-based fishing community has protested against the pollution of coastal areas due to discharge of sewage and chemical waste from industrial units, which adversely impacts its business. Vasai fishermen stated that since they are the original inhabitants of Mumbai and its suburban areas, they have right over their land.The community fears that since Koliwadas were not demarcated in the CZMP map, they could be  treated as slum dwellers and their habitations would come under SRA projects. The MCZMA officials admitted that Palghar and Raigad coasts have deteriorated over time and will be proposing a Common Effluent Treatment Plant (CETP) and Sewage Treatment Plant (STP) for the areas.

The fishermen community from Vasai and Dahanu areas of Palghar district have objected to the draft coastal zone management plan (CZMP) maps for Thane and Palghar, which were released in November by the Maharashtra Coastal Zone Management Authority. "The state environment ministry has suggested that the buffer zone around coastlines should be reduced to 200 meters instead of the existing 500 meters. We have opposed the suggestion," said Dilip Mathak, a fishermen from Vasai."The Koli community has been here for decades, yet there is a feeling of non-confidence among the habitants that the area may also come under SRA due to slum encroachments over the China submersible pump Suppliers years.Fishermen from Vasai do not lay fishing nets at the coastline or in the shallow waters as they struggle to find fish at the coastline. The NGO has compiled all the objections of Kolis while stating that there is also a need to publish the maps in Marathi.  The MCZMA has stated that it would look into the objections of fishermen and the expert panel would take a call on them. The community has claimed that over the last 20 years, their business has decreased by 50 per cent due to the excessive chemical and sewage pollution at the coastline. Vasai fishermen fear that SRA projects will result in dislocation of the inhabitants from their land at the time of the construction and impact their lifestyle with smaller living spaces eventually." said a senior MCZMA official. "The process of demarcating the Koliwadas and providing ownership to the land does not lie with MCZMA, but with district collectors. "It was in 1995 when fish were last found in the shallow waters of Vasai coast. We give security to the Koliwadas that are approved by the collector. Fishermen said that they should have ownership rights to the land where they have been residing from pre-Independence days. It will lead to more private projects and hotels along the coastline.